Corrective action means HHSC requires steps to address compliance concerns; see the official HHSC record for details.
Adverse action means HHSC has taken enforcement action affecting an operation’s permit or ability to operate; see the official HHSC record for details.
Summary of state inspection records
Texas HHSC records list 5 inspections dated between October 10, 2023 and October 10, 2026.
The most recent inspection in these records is dated March 31, 2026.
The same records list 6 cited deficiencies dated December 19, 2023 to April 16, 2025 (HHSC risk levels: 2 High, 2 Medium High, 1 Medium, 1 Medium Low).
Correction status recorded by HHSC: 1 corrected at inspection, 5 with a correction date recorded, 0 with no correction date recorded.
HHSC lists a verified correction date for 5 of these citations.
The official HHSC record has the full inspection history and the latest information.
Generated from Texas HHSC state records. Counts and dates come directly from the published state data; no descriptions were written by a model.
This summary is generated automatically from public HHSC records. It restates the official record and may lag behind it. The official state record is the authoritative source: official HHSC record.
Texas Health and Human Services records list 6 cited deficiencies for A Special Place in the 3 years before October 10, 2026 (2 High, 2 Medium High, 1 Medium, 1 Medium Low).
Records list 5 inspections in this window. Most recent inspection: 2026-03-31.
HHSC risk weights of citations
Risk weight
Citations
High
2
Medium High
2
Medium
1
Medium Low
1
Low
0
Unknown
0
HHSC assigns each standard a risk weight from Low to High. A deficiency is a finding that a minimum standard was not met.
A review of the Employees Who Left Employment in 2024 data revealed that the center had not reported the number of employees who left employment in 2024 by January 15, 2025, as required.
Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
The pea gravel used as the loose fill on the front playground and afterschool playground is not 6 inches deep. The arch climber and playstructure on the afterschool playground both require the pea gravel.
Corrected at inspection: No. Correction date: 2025-01-24. Correction verified: 2025-01-23.
A review of the Employees Who Left Employment in 2024 data revealed that the center had not reported the number of employees who left employment in 2024 by January 15, 2025, as required.
Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
Corrected at inspection: No. Correction date: 2024-05-16. Correction verified: 2024-05-25.
The pea gravel used as the loose fill on the front playground and afterschool playground is not 6 inches deep. The arch climber and playstructure on the afterschool playground both require the pea gravel.
Corrected at inspection: No. Correction date: 2023-06-05. Correction verified: 2023-05-12.
The operation has not complete their children product certification since 01/03/2022.
Source: Texas HHSC Child Care Regulation, via data.texas.gov (CC0). See the official record: https://childcare.hhs.texas.gov/Public/InspectionAndComplianceHistory?operationId=256940
Records reflect only deficiencies published by the state after due process. This page does not rate or rank providers. Check the official record for the latest information.