2025-08-01 · 746.3701 · Medium High
Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
Correction date recorded: 2025-08-19
Licensed Center
View the official HHSC recordOfficial HHSC provider profile
Report an issue with this page · Corrections and removal process
Corrective action means HHSC requires steps to address compliance concerns; see the official HHSC record for details.
Adverse action means HHSC has taken enforcement action affecting an operation’s permit or ability to operate; see the official HHSC record for details.
Texas HHSC records list 5 inspections dated between October 10, 2023 and October 10, 2026.
The most recent inspection in these records is dated March 4, 2026.
The same records list 3 cited deficiencies dated August 1, 2025 (HHSC risk levels: 1 High, 2 Medium High).
Correction status recorded by HHSC: 0 corrected at inspection, 3 with a correction date recorded, 0 with no correction date recorded.
HHSC lists a verified correction date for 3 of these citations.
The official HHSC record has the full inspection history and the latest information.
Generated from Texas HHSC state records. Counts and dates come directly from the published state data; no descriptions were written by a model.
View the official state record · Report an issue with this page
This summary is generated automatically from public HHSC records. It restates the official record and may lag behind it. The official state record is the authoritative source: official HHSC record.
Texas Health and Human Services records list 3 cited deficiencies for Treehouse Day School in the 3 years before October 10, 2026 (1 High, 2 Medium High).
Records list 5 inspections in this window. Most recent inspection: 2026-03-04.
| Risk weight | Citations |
|---|---|
| High | 1 |
| Medium High | 2 |
| Medium | 0 |
| Medium Low | 0 |
| Low | 0 |
| Unknown | 0 |
HHSC assigns each standard a risk weight from Low to High. A deficiency is a finding that a minimum standard was not met.
2025-08-01 · 746.3701 · Medium High
Safety - Areas Free From Hazards
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
Correction date recorded: 2025-08-19
2025-08-01 · 746.1003(1) · High
Director Responsibilities - Operate in Compliance
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
Correction date recorded: 2025-08-19
2025-08-01 · 746.4305 · Medium High
Fenced Outdoor Activity Space
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
Correction date recorded: 2025-08-19
2025-08-01 · 746.4305 · Medium High
Fenced Outdoor Activity Space
Corrected at inspection: No. Correction date: 2025-08-19. Correction verified: 2025-08-22.
This standard was evaluated and found deficient. The operation used a blow-up water slide without the required fence and use zone.
2025-08-01 · 746.1003(1) · High
Director Responsibilities - Operate in Compliance
Corrected at inspection: No. Correction date: 2025-08-19. Correction verified: 2025-08-22.
This standard was evaluated and found to be deficient. The directors were not aware on the required fence and zoning while using a blow-up slide outside.
2025-08-01 · 746.3701 · Medium High
Safety - Areas Free From Hazards
Corrected at inspection: No. Correction date: 2025-08-19. Correction verified: 2025-08-22.
This standard was evaluated and found deficient. The operation used a blow-up water slide outdoor Infront of the parking lot.
2023-07-06 · 746.1309(e) · Medium
Documented Annual Training- Required Content
Corrected at inspection: No. Correction date: 2023-07-28. Correction verified: 2023-07-12.
One staff member did not have the emergency preparedness training.
2022-09-02 · 746.4805(b) · Medium High
Measurement of Use Zone for Slides - Six Feet High or Less
Corrected at inspection: No. Correction date: 2022-10-28. Correction verified: 2022-10-13.
The operation has two playground structures that were not in compliance with the fall zones. The slides must have an area of six feet in front or beside that does not prevent them from hitting another structure or concrete if a child were to fall.
2022-09-02 · 746.4915 · Medium High
Additional Surfacing Requirements for Indoor Active Play Equipment
Corrected at inspection: No. Correction date: 2022-10-28. Correction verified: 2022-10-20.
The playground structure requires loose fill surfacing.
2021-10-20 · 746.1201(1) · High
Responsibilities of Employees and Caregivers -Demonstrate Competency, Good Judgment, Self-control
Corrected at inspection: No. Correction date: 2021-11-15. Correction verified: 2021-11-16.
The operation was inconsistent when explaining the details of an incident involving a child.
Source: Texas HHSC Child Care Regulation, via data.texas.gov (CC0). See the official record: https://childcare.hhs.texas.gov/Public/InspectionAndComplianceHistory?operationId=1328102
Records reflect only deficiencies published by the state after due process. This page does not rate or rank providers. Check the official record for the latest information.
Provider data fetched: October 10, 2026.